Energy • Duke Energy Progress


Brunswick Nuclear Plant Turbine-Outage

For more information on CTT projects please contact us at 910.397.2929.

STRUCTURAL
BRUNSWICK NUCLEAR PLANT, UNIT 1 – TURBINE OUTAGE LAYDOWN PLAN AND ANALYSIS

Project highlights:

  • Designed the laydown plan for turbine outage equipment
  • Provided structural analysis of the existing turbine deck
  • Designed modular deck opening framing

BNP U1 OUTAGE LAYDOWN PLAN
Click here to download a detailed project overview

next project